background

CESHSMP Preparation for New Butwal – New Damauli 400 kV Transmission Line

Project details and scope of work.

Alpine Consultancy Pvt. Ltd. was engaged to prepare the Contractor’s Environmental, Social, Health and Safety Management Plan (CESHSMP) for a 90 km high-voltage transmission line project.

The project involves the construction of a 400 kV double circuit transmission line connecting New Butwal Substation to New Damauli Substation. The assignment is part of a comprehensive EPC contract covering design, supply, installation, testing, and commissioning.

Our role focused on developing a detailed CESHSMP to guide project implementation in compliance with environmental and social safeguards, as well as health and safety standards. This included identification of potential risks, preparation of mitigation measures, monitoring plans, and ensuring alignment with national regulations and project safeguard requirements.

The CESHSMP provides a structured framework to support safe construction practices, minimize environmental and social impacts, and ensure overall project compliance.