Alpine Consultancy Pvt. Ltd. carried out the detailed design and preparation of technical documents for the 132 kV single circuit transmission line connecting Sanjen Khola Hydropower Project (HPP) to the Chilime Hub Substation.
The 7.2 km transmission line was designed to ensure reliable power evacuation from the hydropower plant to the national grid. The assignment included preparation of detailed engineering drawings, technical specifications, and supporting documentation required for construction and implementation.
Our work focused on delivering technically sound and implementable design solutions aligned with national standards and project requirements. The design supports efficient power transmission while ensuring safety, structural stability, and long-term operational reliability.