background

Projects

A selection of Alpine Consultancy assignments across environmental assessment, safeguards, geophysical surveys, and infrastructure support.

Name of the Project Client Competition Date
Project Name: 2D-ERT Survey – Seti Nadi Bridge, Lamgadi, Kaski LRBP-LRBSU May 2019
Ramsar Site Declaration Guideline – Nepal WWF Nepal / Hariyoban Program December 2018
EIA of Sankhuwa Khola 1 Hydropower Project (40.82 MW) – Sankhuwasabha Hydro Consult Engineering (P) Ltd. December 2018
EIA of Sankhuwa Khola Hydropower Project (41.06 MW) – Sankhuwasabha Hydro Consult Engineering (P) Ltd. December 2018
Environmental and Social Studies – Tamakoshi V HEP (99 MW) Total Management Service Pvt. Ltd. October 2018
2D ERT Survey – Thulo Khola Hydropower Project, Myagdi Sungava Foundation (P) Ltd., Sanepa, Lalitpur August 2019
2D ERT Survey – Darbang Myagdi Khola Hydropower Project Dhaulagiri Kaliki Hydro Ltd. April 2019
IEE of Thulo Khola Hydropower Project (21.3 MW) – Myagdi Sungava Foundation (P) Ltd., Sanepa, Lalitpur September 2018
Midterm Environmental Monitoring – Upper Solu Hydroelectric Project (23.5 MW) Upper Solu Hydropower Company Ltd. September 2018
Climate Change Indicator Study – Gandaki River Basin Hariyoban Program / USAID / WWF July 2018