|
Project Name: 2D-ERT Survey – Seti Nadi Bridge, Lamgadi, Kaski
|
LRBP-LRBSU |
May 2019 |
|
Ramsar Site Declaration Guideline – Nepal
|
WWF Nepal / Hariyoban Program |
December 2018 |
|
EIA of Sankhuwa Khola 1 Hydropower Project (40.82 MW) – Sankhuwasabha
|
Hydro Consult Engineering (P) Ltd. |
December 2018 |
|
EIA of Sankhuwa Khola Hydropower Project (41.06 MW) – Sankhuwasabha
|
Hydro Consult Engineering (P) Ltd. |
December 2018 |
|
Environmental and Social Studies – Tamakoshi V HEP (99 MW)
|
Total Management Service Pvt. Ltd. |
October 2018 |
|
2D ERT Survey – Thulo Khola Hydropower Project, Myagdi
|
Sungava Foundation (P) Ltd., Sanepa, Lalitpur |
August 2019 |
|
2D ERT Survey – Darbang Myagdi Khola Hydropower Project
|
Dhaulagiri Kaliki Hydro Ltd. |
April 2019 |
|
IEE of Thulo Khola Hydropower Project (21.3 MW) – Myagdi
|
Sungava Foundation (P) Ltd., Sanepa, Lalitpur |
September 2018 |
|
Midterm Environmental Monitoring – Upper Solu Hydroelectric Project (23.5 MW)
|
Upper Solu Hydropower Company Ltd. |
September 2018 |
|
Climate Change Indicator Study – Gandaki River Basin
|
Hariyoban Program / USAID / WWF |
July 2018 |