background

Survey & Design – 220 kV Transmission Line (Upper Marsyangdi-1 HEP)

Client: Yellow River Co. Ltd. | Date: December 2022

Engineering survey and design of a 220 kV transmission line for the Upper Marsyangdi-1 Hydropower Project, including route alignment study and technical design.