Hydrogeological Study (VES) – Doti & Achham
|
Drinking Water and Sanitation Division Office, Division No. 3, Rajpur, Doti |
May 2023 |
|
EIA of Lamki Branch Canal Extension – Rani Jamara Kulariya Irrigation Project
|
Rani Jamara Kulariya Irrigation Project, Department of Water Resources and Irrigation |
March 2023 |
|
Detailed Design – 132 kV Transmission Line (Sanjen Khola HEP, 78 MW)
|
Yellow River Co. Ltd. |
March 2023 |
|
Hydrogeological Study – Jhapa Groundwater Irrigation Project
|
Jhapa Groundwater and Irrigation Project |
February 2023 |
|
Survey & Design – 220 kV Transmission Line (Upper Marsyangdi-1 HEP)
|
Yellow River Co. Ltd. |
December 2022 |
|
Environmental Monitoring Report – Mathillo Midim HEP (7.5 MW)
|
Bhujung Hydropower Company Ltd. |
November 2022 |
|
IEE & BES – Tamor River Bridge & Gideri River Bridge Projects
|
Surya-Elite JV, Dharan (Under Design and Build Contract) |
October 2022 |
|
Updated EMP – Mathillo Midim HEP (7.5 MW)
|
Bhujung Hydropower Private Ltd. |
September 2022 |
|
IEE Report – Dudh Dordi Hydropower Project (19 MW), Lamjung
|
Insight Engineering Consult Pvt. Ltd. |
August 2022 |
|
IEE & BES – River Bridge Projects (6 Bridges), Madhesh Province
|
Kalika Construction Pvt. Ltd. (Under Design and Build Contract) |
March 2022 |