|
IEE of Stone, Gravel and Sand Extraction – Dhankuta District
|
Office of District Development Committee, Dhankuta |
July 2012 |
|
Petrographic Analysis of Different Rock Samples for Soil, Rock and Concrete Laboratory
|
Nepal Electricity Authority, Swayambhu, Kathmandu |
July 2012 |
|
State of Environment Report of Nepal, 2012
|
Ministry of Environment, Science and Technology, Singhdurbar, Kathmandu |
July 2012 |
|
National Environment Policy of Nepal, 2012
|
Ministry of Environment, Science and Technology, Singhdurbar, Kathmandu |
July 2012 |
|
Detailed Design of 132/220 kV Substation for 78 MW Sanjen Khola HPP
|
Yellow River Pvt Ltd |
July 2024 |
|
Detail Design of 132 kV Transmission Line for Sanjen Khola HPP – Chilime Hub Substation (7.2 KM)
|
Yellow River Pvt. Ltd. |
January 2025 |
|
CESHSMP Preparation for New Butwal – India Border 400 kV Transmission Line (18 KM)
|
Transrail Lighting Limited (Contract No: MCA-N/ETP/CB/006) |
March 2025 |
|
CESHSMP Preparation for New Butwal – New Damauli 400 kV Transmission Line
|
WAIBA/SALSAR JV (Contract No: MCA-N/ETP/CB/009C) |
March 2026 |
|
CESHSMP Preparation for New Butwal – New Damauli 400 kV Transmission Line
|
- |
- |
|
CESHSMP Preparation for Lapsiphedi – Ratmate – New Hetauda 400 kV Transmission Line
|
ASHISH - BOZLAR J/V |
June 2026 |